BACKYARD COURTS – STAGE 1, 2, 3

Stage 1.

Prepare Construction Site.

  • Level surface
  • Compacted the area
  • Create Slope Elevation
  • Clean Area.

Stage 2.

Pour Foundations

  • Concrete PUM TBD Charge 100 + FeetĀ 
  • Thickness Rebard 1/2″
  • Steel Bar Size (D.C) Rebard 3/8″
  • P.S.I 3500 Concrete
  • Slope TBD 10%

Stage 3

Additional Elements

  • Acrylic Color Coats – Included in the Package
  • E-54 Basketball Hoops with Backyard TBD
  • E-60 Basketball Hoops with Backyard TBD
  • 1 Lighting Systems

 