Description
BACKYARD COURTS – STAGE 1, 2, 3
Stage 1.
Prepare Construction Site.
- Level surface
- Compacted the area
- Create Slope Elevation
- Clean Area.
Stage 2.
Pour Foundations
- Concrete PUM TBD Charge 100 + FeetĀ
- Thickness Rebard 1/2″
- Steel Bar Size (D.C) Rebard 3/8″
- P.S.I 3500 Concrete
- Slope TBD 10%
Stage 3
Additional Elements
- Acrylic Color Coats – Included in the Package
- E-54 Basketball Hoops with Backyard TBD
- E-60 Basketball Hoops with Backyard TBD
- 1 Lighting Systems